Difference between revisions of "Main Page"

From DUNE
Jump to navigation Jump to search
Line 65: Line 65:
  
 
= ProtoDUNE Cold Electronics Testing =
 
= ProtoDUNE Cold Electronics Testing =
[[protoDUNE CE test]]
+
Materials kept on a separate page: [[protoDUNE CE test]]
== Run Plan ==
 
 
 
09/11/2017
 
 
 
Shift leader: Guang (gyang@nngroup.physics.sunysb.edu)
 
 
 
QC: Mary Bishai (mbishai@bnl.gov x4877)
 
 
 
* No shifts Monday morning and early afternoon for review. Resume full shifting on Tuesday 9/12
 
* FE ASIC warm testing should continue with the A series ASICs on hothdaq2
 
* ADC cold single socket testing should continue with the D series ASICs on hothdaqs 4 (vertical) & 5 (horizontal)
 
* Quad board cold tests recommence on Hothdaq3 with quad board #2. First test chips tested before.
 
* No FEMB testing
 
* Flash memory testing continues on Hothdaq6
 
 
 
If we run out of labeled A or D series ASICs, there are pens in the cabinet. Please self-certify as having good handwriting if you are going to label chips. I suggest doing no more than 50-100 at a time as handwriting deteriorates with fatigue.
 
 
 
== Shift Sign-Up Calendar ==
 
 
 
* [https://docs.google.com/spreadsheets/d/15a-QsJhyJppWninh5XQquv_DmerxDRAn_NDW2tmgj4c/edit#gid=957907399 Cold Electronics Shift Calendar]
 
 
 
Please sign up for shifts in the above Google calendar and notify the Quality Control Co-ordinators (QC) and Shift Leaders by sending them email. New shifters need to take all the required training, read and sign the ESR (Experiment Safety Review) before shift.
 
 
 
== Required Training ==
 
 
 
Below are the training courses required to work on Cold Electronics Testing
 
 
 
* Cybersecurity (GE-CYBERSEC)
 
* Physics department ALARA (PO-RADALARA-W)
 
* Cryogen Safety (HP-OSH-025)
 
* Electric benchtop training (TQ-ELECT-BENCHTOP)
 
 
 
In addition to completing the above training courses, the shifter needs to get a BNL Domain Account (Windows) and review and sign the lab's Experimental Safety Review (ESR) PO-067-2016. When signing the ESR remember to only select the required training courses indicated above.
 
 
 
*[https://www.bnl.gov/training/ Link to BNL Training Page]
 
*[https://www.bnl.gov/accounts/ Link to request BNL Domain Account Online]
 
*[https://ias.bnl.gov/ESR/ Link to ESR]
 
 
 
== Shift E-logs ==
 
 
 
 
 
*[https://docs.google.com/spreadsheets/d/1rtJYg5v41rcLxmTQlQDLlz46yUhW3eCRTdfQpMe2leg/edit#gid=0 Google Sheet Shifter E-log]
 
 
 
Every shifter is required to fill the above Google sheet for every test attempted during shift. Select the appropriate shift sheet as per your shift station (hothdaq1, hothdaq2, hothdaq3 ...etc) and fill all the fields as listed in the sheet. Write proper and detailed description of the Run in the "Notes" column, for example, if a run fails, give a concise description of the error that occurred and at what testing stage.
 
 
 
*[https://elog-phy.bnl.gov/Cold+Electronics+General/page Expert Cold Electronics E-log]
 
 
 
The shift leader is required to add a daily shift summary at end of the shift in the above link as well as any issues needing expert attention. Along-with the shift summary, system experts should also record any changes occurring in testing code, releases, bug fixes, expert instructions, hardware status... etc.
 
 
 
== Front-END ASIC Testing ==
 
 
 
Shifter instructions on the FE ASIC test procedure.
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FE/ProtoDUNE_FE_ASIC_Test_Procedure.pdf FE ASIC Test Procedure]
 
 
 
== ADC ASIC Testing ==
 
Shifter instructions on the ADC ASIC cold test procedure:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/ADC_Shift_Instructions.md ADC ASIC Test-stand Cold Test Shifter Instructions (single socket)]
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/QUADADC/20170907_protoDune_coldElecProdTest_quadADCInstructions.pdf ADC ASIC Test-stand Cold Test Shifter Instructions (quad socket)]
 
Expert instructions on ADC ASIC test procedures:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/ADC/README.md ADC Test-stand Expert Documentation]
 
 
 
== Oscillator Testing ==
 
Shifter instructions on Oscillator cold test procedures:
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/OscillatorTesting/README.md Oscillator Testing Instructions]
 
 
 
== Flash Memory Tester ==
 
Shifter instructions on Flash memory cold test procedures.
 
*[https://github.com/DUNE/femb_doc/blob/master/test_stand_expert/FlashTesting/FlashTestingInstructions.pdf Flash Memory Test Procedure]
 
 
 
== CE Test Summaries ==
 
Summary tables and plots - with links to the full data in the Sumatra database - for ADC/FE ASIC/XO/Flash/FEMB testing are available at:
 
*[http://www.phy.bnl.gov/coldelec/summary/ ASIC and FEMB Test Summaries]
 
 
 
Contact Brett Viren (bviren@bnl.gov) for access.
 
 
 
== Meetings ==
 
 
 
We have weekly meetings on CE Testing Status on Friday at 2:30 pm (EDT). The link to the indico page for these meetings is listed below
 
 
 
[https://indico.bnl.gov/categoryDisplay.py?categId=153 Cold Electronics Weekly Shift Mtg]
 
 
 
Sign-up for ce-teststands-l@lists.bnl.gov email list to get meeting notifications.
 

Revision as of 20:39, 19 December 2017

Welcome to the DUNE@BNL Wiki!

The official DUNE wiki is at https://wiki.dunescience.org/ (login required).

This wiki is intended to hold info relevant to BNL's involvement in DUNE.

DUNE Institutions and people

Publications

Select publications by and about DUNE are collected in the Publications topic.

CERN

Useful CERN Links:

CERN Prototype

CERN Account Management

Once a membership is established, the account may be configured (e.g. one can create secondary and/or service accounts and apply for group membership at the CERN Account Management Page.

Detectors, Physics, planning, general interest

DUNE Far Detectors

Current and future prototypes

DUNE and its predecessor LBNE

Other Experiments

DUNE Computing

Please visit the DUNE Computing topic. Some direct links:


ProtoDUNE Cold Electronics Testing

Materials kept on a separate page: protoDUNE CE test