==1. Cryostat design == | ==1. Cryostat design == | ||
− | |||
− | |||
Line 27: | Line 25: | ||
===Ross Cage Design === | ===Ross Cage Design === | ||
− | Bill's proposal: | + | Bill's proposal: [http://docs.dunescience.org:8080/cgi-bin/RetrieveFile?docid=1871&filename=Cage%20Parameters_FD_25OCT2016.pdf&version=1] |
=== Random information and questions === | === Random information and questions === |
Revision as of 13:22, 26 October 2016
Action Items for the Installation and Integration group
1. Cryostat design
List of the components using the TCO
- -> Who?
Roof penetration locations
- Detector support structure interference
- -> Jack
Cable routing to the feedthroughs
- -> Who?
Floor loading
- -> Who?
2. Underground space
Plan for the work flow
Ross Cage Design
Bill's proposal: [1]
Random information and questions
- If we make the cage tall enough to fit the APA crate inside, the excavation equipment for CF may not fit inside because the cage reduces maximum width by ~4” (100 mm) as compared to a slung load
- Making the cage taller also makes it heavier, reducing the weight capacity for both slung and cage loads
- Can we do to the Yates shaft for some items? Boundary conditions.