Difference between revisions of "Installation and Integration/ActionItems"

From DUNE
Jump to navigation Jump to search
Line 6: Line 6:
 
What is needed:
 
What is needed:
  
# List of the components using the TCO
 
  
# Roof penetration locations
+
=== List of the components using the TCO===
Detector support structure interference
+
 
: Jack  
+
*'''-> Who?'''
# Floor loading
+
 
 +
===Roof penetration locations===
 +
*Detector support structure interference
 +
*''' -> Jack'''
 +
 
 +
===Cable routing to the feedthroughs ===
 +
 
 +
===Floor loading===
  
 
==2. Underground space  ==
 
==2. Underground space  ==

Revision as of 12:50, 26 October 2016

Action Items for the Installation and Integration group

1. Cryostat design

What is needed:


List of the components using the TCO

  • -> Who?

Roof penetration locations

  • Detector support structure interference
  • -> Jack

Cable routing to the feedthroughs

Floor loading

2. Underground space