Difference between revisions of "Installation and Integration/ActionItems"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
What is needed: | What is needed: | ||
− | |||
− | + | === List of the components using the TCO=== | |
− | Detector support structure interference | + | |
− | + | *'''-> Who?''' | |
− | + | ||
+ | ===Roof penetration locations=== | ||
+ | *Detector support structure interference | ||
+ | *''' -> Jack''' | ||
+ | |||
+ | ===Cable routing to the feedthroughs === | ||
+ | |||
+ | ===Floor loading=== | ||
==2. Underground space == | ==2. Underground space == |
Revision as of 12:50, 26 October 2016
Contents
Action Items for the Installation and Integration group
1. Cryostat design
What is needed:
List of the components using the TCO
- -> Who?
Roof penetration locations
- Detector support structure interference
- -> Jack